国产探花免费观看_亚洲丰满少妇自慰呻吟_97日韩有码在线_资源在线日韩欧美_一区二区精品毛片,辰东完美世界有声小说,欢乐颂第一季,yy玄幻小说排行榜完本

首頁 > 學院 > 網絡通信 > 正文

RFC131 - Response to RFC116: May NWG meeting

2019-11-04 11:28:57
字體:
來源:轉載
供稿:網友

  Network Working Group E. Harslem - Rand
Request For Comments: 131 J. Heafner - Rand
APRil 1971

Response to RFC#116 (May NWG Meeting)

Phase One

Software Status of 360/65

1) Our software is currently being changed to reflect the new NCP
protocol delineated in RFC#107. These changes will be completed
before the end of May.

2) We are implementing a logger that, after an automatic ICP
dialog, can be driven from a local console. Any desirable messages
can be sent or received in EBCDIC, ASCII (8), or as binary streams.
The purpose of the logger is to allow sites to checkout remote log in
procedures. Since no prodUCtion-oriented services will be offered on
the 360/65, the logger is for eXPerimental purposes only. It will be
completed before the end of May.

3) We have not planned a TELNET. We will, however, implement both
server and user TELNETs once a specification is generally accepted.
Implementation time will be on the order of two weeks.

Transition from 360/65 to PDP-10

1) We plan to move from our 360/65 to a PDP-10. Rand will offer
Network services on the PDP-10. The hardware and software status of
the PDP-10 will be reported later.

2) The 360/65 Network connection will remain for some time due to
its production use by another ARPA-sponsored project at Rand.
Maintenance of the 360/65 Network software will be provided for the
lifetime of the connection but no new programs will be developed on
the 360/65 after September.

1) The UCSB/Rand Network activities were recently reported in RFC
#113 and earlier in RFC#78. The Climate Dynamics Project (CDP) at
Rand will continue to use this facility (more heavily) in the future.

2) In conjunction with the above facility, the Rand Network team
has planned and implemented a front-end graphics program to allow the
reduced data from UCSB to be displayed and interacted with locally as
graphs, contours, plots, and lists. This will be used in about three
months after an intermediate program, being written by the CDP
personnel, is completed.

Phase Two

Experimental Data Reconfiguration Service (Form Machine)

1) A working session was held recently at Rand on the Data
reconfiguration Service (DRS), the results of which have been drafted
and are being edited by the participants. These data will be
published soon as an RFC. Eric Harslem will be prepared to make an
oral report at the NWG meeting on the DRS.

Protocol Manager

1) We plan to submit a positional paper on a proposed Protocol
Manager, which will allow flexibility in both experimental and
production use of connection protocols. This will be presented as a
Request for Comments on a software package that Rand intends to
implement for its use on the PDP-10. For example, it should obviate a
fixed logger on our forthcoming PDP-10.



1) We have been proponents of the collective NWG as a forum to
raise issues and as a general information transfer mechanism of what
sites are doing and thinking. More recently small working groups and
committees have been formed to generate particular specifications such
as TELNET, the new NCP protocol, etc. We favor continuance of these
methods as long as any site with a willingness, an interest, and
contribution is not excluded from any group or committee. We feel
that these groups will limit themselves to a small functional size a
priori because they are directed toward special interests.

The long lead time between the formation of such a group and
their final output (and subsequent implementation of the plan) has
been accepted by the NWG Technical Chairman and is rather
disconcerting. The NCP glitch cleaning committee is an example of
expedient work. UTAH, for example, has already implemented the new NCP
protocol. Other groups (including the DRS) have not been as
responsive. Perhaps the technical problems addressed by other groups
are more complex and the needs for their solutions are not as
immediate as the NCP glitches. We offer no nice solution except that
perhaps some guidelines should be established concerning timely
publication of reports.

2) Regarding long range goals of the NWG, we do not think that
the NWG is the right body to establish the long range goals. By long
range goals of the NWG, we are really concerned (in part) with long
range goals of the Network. We feel that the Principal Investigators
are in a position to have a better perspective of long range Network
goals than the NWG members. As a suggestion, one way of converting
their views into NWG tasks is to have the NWG Technical Chairman host
a one day opinion session of the Principal Investigators, then report
these views to the NWG for the generation of their implied tasks.

[ This RFCwas put into machine readable form for entry ]
[ into the online RFCarchives by Jim Thompson 4/97 ]


發表評論 共有條評論
用戶名: 密碼:
驗證碼: 匿名發表
主站蜘蛛池模板: 夏津县| 永平县| 古交市| 江川县| 隆尧县| 乐山市| 淮南市| 洛南县| 社会| 义乌市| 雅安市| 宜宾市| 三门峡市| 全椒县| 曲沃县| 合阳县| 确山县| 霞浦县| 阿瓦提县| 安顺市| 阿拉善右旗| 香格里拉县| 灵璧县| 成都市| 剑河县| 古丈县| 兴义市| 仙桃市| 古蔺县| 岳西县| 临洮县| 延长县| 瑞金市| 和静县| 桂阳县| 阜新| 邢台市| 长泰县| 乐山市| 湖北省| 深圳市|